Implementation Of Life Cycle Cost in The Bus Station Building
DOI:
https://doi.org/10.28932/jts.v20i2.6382Keywords:
Building, Cost, Maintenance, ReplacementAbstract
With the increase in existing development, of course, there must be consideration of careful cost planning to support planning, use, and the end of the building service period, particularly in the building industry. The use of the LCC method in estimation is one part of estimating the service life. Both qualitative and quantitative methodologies were used in this investigation.. The research refers to the terminal development project, and takes a sample of the building which is the focus of the research. The Budget Plan, containing each of its elements, is also the foundation of the research. The building's service life is then estimated and considered to be 25 years of operation., the resulting life cycle cost is Rp. 20,499,410,364, - The largest cost during the service life of the building is 25 years, which is found in operational costs Rp. 9,302,325,418 (40.86%), the initial cost is Rp. .7,769,441,715 (34.12%), maintenance costs Rp. 2,312,949,413 (10.16%), replacement cost Rp.2,249,032,308 (9.88%) and salvage value Rp.1,134,338,490 (4.98%).Downloads
References
Heralova, R. S. (2014): Life Cycle Cost Optimization Within Decision Making on Alternative Designs of Public Buildings, Procedia Engineering, 85, 454–463. https://doi.org/10.1016/J.PROENG.2014.10.572
Building and constructed Assets: Service Life Planning – Part 5: Life Cycle Costing. ISO 15686-5. 2017. ISO Geneva.
Heralova, R. S. (2017): Life Cycle Costing as an Important Contribution to Feasibility Study in Construction Projects, Procedia Engineering, 196, 565–570. https://doi.org/10.1016/J.PROENG.2017.08.031
Higham, A., Fortune, C., dan James, H. (2015): Life cycle costs: Evaluating their use in UK practice, Structural Survey, 33(1), 73–87.
Kehily, D., dan Underwood, J. (2017): Embedding life cycle costing in 5D BIM, Journal of Information Technology in Construction (ITcon), diperoleh melalui situs internet: http://www.itcon.org/2017/8, 22, 145–167.
Kirkham, R. (2013): Ferry and Brandon’s Cost Planning of Buildings (8 ed.), Wiley.
Atpadkar dan Kogonole. 2018. Optimalisasi biaya struktur perumahan dengan analisis biaya siklus hidup. Sebuah jurnal internasional tren dalam penelitian dan pengembangan ilmiah. 2 (2): 15831586
Rashid. 2016. Perbandingan SeaBridge dan terowongan bawah air menggunakan Lifecycle Cost Analysis (LCCA). IJSART (9): 327333
Krisnanda.S.F. 2020. Implementasi life cycle cost pada gedung bank mandiri Syariah Yogyakarta. Fropil Vol.8 no.1. hal 46-55.
Iskandar. 2015. Costs Efficiency Evaluation using Life Cycle Costing as Strategic Method. Procedia Economics and Finance. 34:337 – 343.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Divan Yoan Alvino Damanik
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.