Evaluation of the Implementation of Contract Change Order as A Solution to the Problem of Contract Scope Changes

Authors

  • Bintang Putra Nusantara Universitas Trisakti
  • Sutardi Sutardi Universitas Trisakti

DOI:

https://doi.org/10.28932/jts.v19i2.4508

Keywords:

Addendum, Contract Change Order, Earned Value Analysis

Abstract

Construction industry activities are increasing. Construction industry players need to be prepared to face the possibility of changes of design planed that are not in accordance with field conditions. The purpose of this research is to identify, analyze the causes and impacts of Contract Change Orders (CCO) at the pre-construction, construction implementation, and post-construction stages with case study is Proyek Simpang Susun Balaraja Timur at Tol Jakarta – Merak, Kabupaten Tangerang. The research method used is descriptive and qualitative methods by conducting Earned Value Analysis and Fishbone Analysis to identify the causal factors and impacts of CCO so that efforts can be made to mitigate the performance of the construction contract from the aspect of quality, cost, and time. The results of the analysis show 3 factors causing CCO namely consultant factors, such as lack of planning preparation and non-compliance with field conditions, project owner factors, and contractor factors. The results of Earned Value Analysis with Estimate at Completion (EAC) calculations can be used to identify the need for additional contract value and additional execution time. On initial contract identification: Cost Performance Index (CPI) is 0.77 (insufficient costs with cost overrun – Rp.  52.502,111,631.83) and Schedule Performance Index (SPI) 1.21, means that Addendum 1 needs to be done with the results: CPI is 1.17 (the costs used are sufficient from the available fees), EAC is Rp. 189,848,751,106.02 with changes in the contract value is Rp. 222,017,999,900.65, SPI is 1.21 from the initial contract value Rp. 174,437,684,167.96

Downloads

Download data is not yet available.

References

A A Suprapto, I. P. (2020). Analysis of the category of variation order in x project at XYZ . 4th International Conference on Civil Engineering Research (ICCER 2020) - doi:10.1088/1757-899X/930/1/012021, Pages 1-5.

al, A. e. (2021). The Impact of Uncertainty in the Measurement of Progress in Earned Value Analysis. Procedia Computer Science 181 (2021) E-mail address: [email protected], , 457-467.

Alaryan, A. (2014). Causes and Effects of Change Orders on Construction Projects in Kuwait. Int. Journal of Engineering Research and Applications, ISSN : 2248-9622, Pages: 1-8.

Albtoosh, J. A. ( 2017). Variation Orders Causes In Construction. Global Journal of Engineering Science and Research Management, ISSN 2349-4506 https://www.researchgate.net/publication/342314054, Pages: 25-33.

Czemplik. (2014). Application of Earned Value Method to Progress Control of Construction projects. Procedia Engineering 91 (http://creativecommons.org/licenses/by-nc-nd/3.0/), Pages 424-428.

Desyardi, H. (2018). Guidelines for effective Variation Order determination strategy. OP Conf. Series: Earth and Environmental Science, doi:10.1088/1755-1315/258/1/012030, Pages: 1-19.

Dewantoro, L. d. (2017). Penyebab Dan Pengaruh Contract Change Order Pada Proyek Peningkatan Jalan (Studi Kasus Paket Kegiatan Jalan Pasar Panas-Bentot 2 Multiyears). Jurnal Teknika, Vol. 1, No.1 Page 11-20.

dkk, I. A. (2016). Faktor-Faktor Penyebab Change Order Pada Proyek Konstruksi Gedung. A Scientific Journal Of Civil Engineering, ISSN : 1411 - 1292, Pages: 1-7.

Gumolili , S. A. (2012). Analisa Faktor-Faktor Penyebab Change Order Dan Pengaruhnya Terhadap Kinerja Waktu Pelaksanaan Proyek Konstruksi Di Lingkungan Pemerintah Provinsi Sulawesi Utara. Jurnal Ilmiah Media Engineering, (http://creativecommons.org/licenses/by-nc-nd/3.0/) Pages 424-428.

Hairuddin Mohammad et. al. (2021). Managing Risk in Construction Project. Sustainable Construction Engineering https://www.researchgate.net/publication/348957736. Pages 102-124.

Hassan, A. J. (2020). Cost Risk Management for Variation Orders in Road Projects. Engineering and Technology Journal , Pages: 166-172.

Henuk, 1. Y. (2016). Studi Mengenai Directed Changes Dan Constructive Changes Pada Proyek Bangunan Tinggi Di Surabaya. Dimensi Utama Teknik Sipil, DOI: 10.9744/duts.3.2, Pages: 23-30.

Hirman et. al. (2019). Project Management during the Industry 4.0 Implementation with Risk Factor Analysis. 2351-9789 © 2019 The Authors. Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/) Peer-review under responsibility of the scientific committee of the Flexible , Pages 1181-1188.

Ismail, I. A. (2021). Identifying the Key Causes and Impacts of Variation Orders in Iraqi Construction Projects. Diyala Journal of Engineering Sciences, Pages: 18-27.

Kaoru Ishikawa, B. &. (2007). from fishbones to world peace. Qual Saf Health Care 2008;17:150–152. doi:10.1136/qshc.2007.025692, Pages 150-152.

Keane et al. n.d. (2010). Variations and Change Orders on Construction Projects. J. Leg. Aff. Dispute Resolut. Eng. Constr. 2010.2 Quantity Surveyor in Gallifordtry, Construction Company. U.K. E-mail: [email protected],, Pages 89-96.

Keshk et. al, .. (2017). Special studies in management of construction project risks, risk concept, plan building, risk quantitative and qualitative analysis, risk responsestrategies. El Sevier - 1110-0168 _ 2018 Production and hosting by Elsevier B.V. on behalf of Faculty of Engineering, Alexandria University, Page 1-16.

Koirala, N. (2021). Variations Order of Building Construction Project a Case from Nepal. Journal of Advanced Research in Construction and Urban Architecture, Pages: 25-33.

Kuswandari et. al. (2018). Pengaruh Dampak Contract Change Order Terhadap Kinerja Kontraktor Proyek Studi Kasus: Rehabilitasi Jembatan Ngablak. Jurnal Teknik Sipil Volume 14, No. 4, Pages 255-262.

Lenderink et. al. (2022). Procurement and innovation risk management: How a public client managed to realize a radical green innovation in a civil engineering project. 1478-4092/© 2022 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/). https://doi.org/10.1016/j.pursup.2022.100747, , Pages 1-16.

M, C. (2020). Fishbone Diagram for Technological Analysis and Foresight. Int. J. Foresight and Innovation Policy, Vol. 14, Nos. 2/3/4, SSRN Electronic Journal DOI: 10.2139/ssrn.3719084, Email: [email protected], Pages 225-247.

Msallam, M. ( 2015). Controlling Of Variation Orders in Highway Projects in Jordan. Journal of Engineering and Architecture, Published by American Research Institute for Policy Development, ISSN: 2334-2986, Pages: 95-104.

Muh, N. (2018). Faktor Penyebab Dan Dampak Change Order Pada Proyek Konstruksi Bangunan Air –- Jurnal Infrastruktur. Jurnak Infrastruktur, 1-12.

Muhammad, N. Z. (2015). Causes Of Variation Order In Building And Civil Engineering Projectsin Nigeria. Jurnal Teknologi (Sciences & Engineering), eISSN 2180–3722, 77:16 (2015) 91–97 | www.jurnalteknologi.utm.my .

Proyek, I. M. (2017). PMBOK Guide Seventh Edition . LCCN 2021011107 (cetak) | LCCN 20210111108 (ebook) | ISBN 9781628256642 (sampul tipis) | ISBN 9781628256659 (epub) | ISBN 9781628256666 (edisi menyalakan) | ISBN 9781628256673.

Putra, H. E. (2020). Pengaruh Change Order Terhadap Biaya, Mutu, Dan Waktu Pada Proyek Konstruksi Gedung Bertingkat. Jurnal Mitra Teknik Sipil, EISSN 2622-545X, Pages: 1349-1362.

Sapulette, W. (2009). Analisa Penyebab Dan Pengaruh Change Order Pada Proyek Infrastruktur Dan Bangunan Gedung Di Ambon. Jurnal TEKNOLOGI, Volume 6 Nomor 2, Pages 627-633.

Sulistio, M. W. (2021). Change Order Dan Risiko Change Order Pada Proyek Jalan Di Jawa Barat. P-ISSN: 2303-2693, P-ISSN: 2303-2693, Volume 10 Nomor 1,.

Tagod et. al. (2021). Coercive pressure as a moderator of organizational structure and risk Management. Empirical Evidence from Malaysian construction industry- 0022-4375/_ 2021 National Safety Council and Elsevier Ltd. All rights reserved https://doi.org/10.1016/j.jsr.2021.02.011, Pages 1-12.

Yadeta, A. E. (2016). The Impact of Variation Orders on Public Building Projects. International Journal of Construction Engineering and Management, Pages: 86-91.

Downloads

Published

2023-10-01

How to Cite

Nusantara, B. P., & Sutardi, S. (2023). Evaluation of the Implementation of Contract Change Order as A Solution to the Problem of Contract Scope Changes. Jurnal Teknik Sipil, 19(2), 204 –. https://doi.org/10.28932/jts.v19i2.4508